亚洲欧洲高清在线无码|字幕网中文aⅴ资源站|色欲男人的天堂综合网站|一本大道东京热无码av|久久精品久久精品中文字幕|中文字幕乱妇无码Av在线|国产一级精品免费看精品99|久久精品国产精品亚洲婷婷九月

Hengshui Youjiete New Material Technology Co., Ltd.

Hengshui YOUJIETE New Material Technology Co., Ltd.Composite Material Complete Set Product for Gas Station

Hotline:0086-0318-8625288Language: Colse EnglishEnglish 中文中文
Standard outward-flanged manhole well(1355)


57-1.jpg

Standard outward-flanged manhole well(1355)

YOUJIETE standard outward-flanged manhole well is mainly used for preventing soil pollution caused by oil leakage occurs on the pipe joint of underground tank in gas stations, but also for preventing the groundwater from entering into the operation well and corrode the equipment instruments in the well. Standard inward-flanged manhole is a protection container for joints, valves, pumps, underground pipeline joints and sensors of underground tank. It also provides a clean space between the underground tank and the ground, to facilitate future repair and maintenance. 

PRODUCT ADVANTAGES

1. Anti-static, high strengthened SMC composite material is adopted for the body structure.

2. Water absorption rate for SMC material is low, which gives a better anti-leakage performance together work with pipe sealing parts.

3. Unique high-pressure thermoforming, advanced manufacturing technology, beautiful appearance

4. 1.35m large working space, easy to operate

5. The well thickness is 10 mm, which is easy to open holes and keep its strength requirement, and easily install.

6. The height can be adjusted according to site actual installation height requirement.

7. Oil and water monitoring sensors can be installed inside, and automatic alarm can be given when leakage occurs, realizing the intelligent management of the oil station.

8. 8 big and small walls of each are for installation of pipeline, conduit etc.

BASIC DATA

1. The wall thickness of standard outward-flanged manhole well is 10mm

2. The standard equipped height in load-bearing tank area is 1 meter, and the height will be increased by 0.15 meters for each additional upper section.

3. The standard equipped height in the non-load-bearing tank area is 1.3m, and the height will be increased by 0.15 meters for each additional upper section.

4. The standard installation hole is 24 holes unequally spaced, but 32 holes equally spaced can also be produced.




武安市| 和林格尔县| 新津县| 甘孜县| 赣州市| 南京市| 绿春县| 行唐县| 高碑店市| 阜康市| 禹城市| 密云县| 石阡县| 应城市| 文安县| 临夏县| 剑阁县| 涟源市| 新闻| 噶尔县| 本溪市| 哈尔滨市| 扎囊县| 靖边县| 邢台县| 天等县| 富宁县| 修文县| 谢通门县| 黄梅县| 永川市| 汕尾市| 新兴县| 乾安县| 门源| 灌阳县| 梅河口市| 琼结县| 华安县| 夹江县| 聂拉木县|